Water Supply - Pump Station Projects
 
Home
Projects
Clients
Presentations
About Us

Contact Us Career Opportunities

 


City Of LathropBooster Station #3 and Reservoir
WBA was retained to complete a fast track design of a new 1250 gpm pump station and a 1 mgd welded steel reservoir and a for the City's potable water system. WBA developed biddable contract documents in two months by incorporating design/build elements into the design. This reduced the typical design period by two months. Two vertical turbine pumps with VFDs were installed with speed control based on system pressure. The design also included an emergency generator, a 3500 gpm diesel driven fire pump and SCADA control and monitoring. The pumps, generator, MCCs, and SCADA control panel were located in a new building designed to match the general appearance of the surrounding homes. In addition, the building was designed to attenuate the sound of the equipment such that it was not noticeable outside the building. The contract documents also included architectural design for the reservoir and site to improve the aesthetic appearance of the project for the neighboring homes.

Buckingham Park Water District
Water Treatment Facilities Improvements

The Buckingham Park Water District selected WBA to design improvements to the District’s water treatment facilities. The District was using both well water and surface water from Clear Lake to supply approximately 300,000 gallons per day. As the well water was of poor quality and the levels in the wells declining, the District wished to modify their treatment facilities to utilize the lake for all of its needs. At the same time the District needed to increase its capacity. WBA evaluated the existing facilities and proposed modifications to convert an existing pressure filter for use on the lake water. The design included adding a new variable speed water pump, adding a new flocculator-clarifier to the plant process train and improving sludge drying facilities. Provisions were made in the design to enable to the District to use the well supply as a backup to the lake supply.

DSRSDWater Pump Stations 200 and 300A
WBA performed construction management for Water Pump Stations 200 and 300A, and provided project management for the design of the pump stations. WBA was able to actively look after the owner’s interests while developing and maintaining a good working relationship with the contractor, and successfully meet various scheduling milestones and constraints. WBA emphasized close coordination with the owner’s operations and engineering field staff so that construction was well integrated with the construction of related facilities, and start-up, testing, and operation of the facilities was well integrated with existing operations. The work also involved working closely with the developer and initial customer to successfully meet developer service requirements.


The above projects are representative of our experience in this area.
If you would like additional information on these, or other projects that
we have completed, please contact us.

For detailed descriptions of representative projects in our other areas of expertise, click below on the category you are interested in:

Recycled Water:

Wastewater:

Water Supply:

Specialized Areas:

 

 

Home - Projects - Clients - Presentations - About Us - Contact Us - Career Opportunities
Copyright 2002, Whitley Burchett & Associates