ABSTRACT
The
use of a design/build approach is very conducive for designing
and installing a SCADA
system at a wastewater treatment
plant. This is particularly true for facilities that are upgrading
existing control and/or SCADA systems. The design/build approach
has the potential to allow an Owner to get a very customized
SCADA
system that meets their needs, more cost-effectively than using
the traditional design-bid-build approach. However, to realize
this potential, the Owner will have to manage the project
differently than what is typically done using a design/bid/build
approach.
This presentation will discuss the different management strategies
the Owner needs to employ to make this approach work. In
addition, the presentation will discuss the key ingredients
to developing
a successful contract to take advantage of the benefits of
using
a design/build approach to design and install a SCADA system.